Sardou Bridge Maintenance, Open House Scheduled

By: Release (Posted by Josh Mabry)
By: Release (Posted by Josh Mabry)

From the City of Topeka

TOPEKA, Kan. – Beginning January 14, the Sardou Bridge linking the North Topeka and Oakland neighborhoods will be closed for about 10 to 12 weeks for repair and maintenance to the support structure under the deck.

The detour for westbound Sardou at the east end of the bridge will be River Road, to E. First Street, to Kansas Avenue (NE Quincy on the north end of the bridge), to NE Morse Street. The eastbound detour will be the reverse.

An open house explaining details of the project is set for 4 to 6 p.m. Thursday, December 20, at the Oakland Community Center, 801 NE Poplar Avenue, located about three blocks east from the east end of the bridge. Engineers from the City and the project consulting firm will be on hand to answer questions.

The bridge, originally built in 1961, is in need of new “rockers” (the piece between a girder and pier or abutment) and abutment work. The work is not temperature-dependent but is weather dependent in regard to precipitation.

Wildcat Concrete Services is the contractor in charge of the $500,000 project.


Comments are posted from viewers like you and do not always reflect the views of this station.
powered by Disqus
631 SW Commerce Pl. Topeka, Kansas 66615 phone: 785-272-6397 fax: 785-272-1363 email: feedback@wibw.com
Gray Television, Inc. - Copyright © 2002-2014 - Designed by Gray Digital Media - Powered by Clickability 183538401