Mars Can't Build Wind Turbine At Topeka Plant

By: AP Posted by Amanda Lanum
By: AP Posted by Amanda Lanum

TOPEKA, Kan. (AP) - The Mars company won't be allowed to build a wind turbine at its Topeka plant because it would interfere with airspace at nearby Forbes Field.

Topeka Airport Authority officials say any tall structure built at the Kanza Fire Commerce Park where the plant is located would severely limit use of Forbes Field.

Mars had planned to build a 300-foot-tall turbine before being told by the Federal Aviation Administration that it was not allowed.

The Topeka Capital-Journal reported Friday (http://bit.ly/w8U6iO) that Mars officials say they are now seeking permission to build a solar field at the plant. The company has said it plans to build the $250 million manufacturing plant to include high environmental standards.

___
Information from: The Topeka Capital-Journal,
http://www.cjonline.com

(Copyright 2012 by The Associated Press. All Rights Reserved.)


Comments are posted from viewers like you and do not always reflect the views of this station.
powered by Disqus
631 SW Commerce Pl. Topeka, Kansas 66615 phone: 785-272-6397 fax: 785-272-1363 email: feedback@wibw.com
Gray Television, Inc. - Copyright © 2002-2014 - Designed by Gray Digital Media - Powered by Clickability 140317213 - wibw.com/a?a=140317213