Resurfacing Project On K-4/Oakland Expressway

Throughout all of Sunday a resurfacing project has begun on the K-4 Oakland Expressway Bridge over the Kansas River reducing north and southbound lanes to just one.

There will be a posted speed limit of 40 MPH with adjacent ramp closures also taking place...

Project work includes pavement repair and the application of a polymer overlay on the bridge deck

All lanes and ramps will re-open to traffic at 6am Monday morning.


Comments are posted from viewers like you and do not always reflect the views of this station.
powered by Disqus
631 SW Commerce Pl. Topeka, Kansas 66615 phone: 785-272-6397 fax: 785-272-1363 email: feedback@wibw.com
Copyright © 2002-2014 - Designed by Gray Digital Media - Powered by Clickability 164187886 - wibw.com/a?a=164187886
Gray Television, Inc.